皇冠最新登陆网址www.hg108.vip)实时更新发布最新最快的皇冠最新登陆代理线路网址、皇冠最新登陆会员线路网址、皇冠最新备用登录网址、皇冠最新手机版登录网址。

,Johor touri *** , environment, heritage and culture committee chairman K. Raven Kumar says the project aims to repair river banks and upgrade embankments. – Facebook pic, June 23, 2022.

THE flood mitigation plan for Sungai Batu Pahat, which is expected to start next year, will benefit more than 35,000 residents in the surrounding area, according to Johor touri *** , environment, heritage and culture committee chairman K. Raven Kumar.

He said the RM190 million project, which will be completed in 2026, involved the construction of a dam and deepening of the river as part of the long-term solution.

“This project aims to repair river banks and upgrade embankments so that water from the stream along the river does not overflow, and reduce the incidence of flash floods when high tide coincides with heavy rainfall,” he said in the Johor assembly sitting today, following a question from Gan Peck Cheng (PH-Penggaram) who wanted to know the status of the project.

Raven said for short-term solutions included river conservation in Taman Batu Pahat, Jalan Pantai, Jalan Masjid, Parit Johar, Parit Sri Molek, and Kampung Muhibbah with funding of RM1.07 million.

Answering a question from Jefridin Atan (BN-Kukup) who wanted to know about plans to attract more tourists to Johor, Raven said the government planned to build a mangrove discovery centre in Tanjung Piai and a mangrove research centre in Pulau Kukup.

He said the two centres would be equipped with public facilities such as toilets, souvenir stalls, cafeterias, surau, hotels, and lounges. – Bernama, June 23, 2022.


转载说明:本文转载自Sunbet。 Allbet Gaming声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:皇冠最新登陆网址(www.hg108.vip)_Exco says Sungai Batu Pahat flood mitigation plan benefits 35,000 people
发布评论

分享到:

约‘yue’搏ETH单双『shuang』博{bo}彩《cai》(www.eth108.vip)_Prosecutors say will prove Syed Saddiq\u2019s alleged actions malicious, dishonest
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。